The snow cover has already drifted, the masonry is drying slowly, the mud in the vicinity of the construction site is slowly curing, and the long-term weather forecast promises to keep temperatures above the freezing point even at night. A few administrative measures and we can continue. The decisive date for commencement of construction works on the half-timbered house, which extends the exhibition of the Museum of Ore Mountains in Lesná, was set on Monday 23 April 2018. The construction of the 2nd floor – the half-timbering, which will be the dominant feature of this replica of the building. You can view photos from the building site at the photo gallery.
New York
-1°
Feels like: -7°CFair
7:15 am4:33 pm EST
Wind: 19km/h NW
Pressure: 1017.27mbar
UV index: 2
SunMonTue
-3/-8°C
-1/-2°C
4/-1°C
-1/-2°C
4/-1°C
Kalendář
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« Feb | ||||||
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 |