The snow cover has already drifted, the masonry is drying slowly, the mud in the vicinity of the construction site is slowly curing, and the long-term weather forecast promises to keep temperatures above the freezing point even at night. A few administrative measures and we can continue. The decisive date for commencement of construction works on the half-timbered house, which extends the exhibition of the Museum of Ore Mountains in Lesná, was set on Monday 23 April 2018. The construction of the 2nd floor – the half-timbering, which will be the dominant feature of this replica of the building. You can view photos from the building site at the photo gallery.
New York
9°
Feels like: 6°CShowers in the Vicinity
6:49 am4:35 pm EST
Wind: 23km/h NNE
Pressure: 997.29mbar
UV index: 1
FriSatSun
7/5°C
12/7°C
13/5°C
12/7°C
13/5°C
Kalendář
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« Feb | ||||||
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |